Features:
Electromagnet protection rate: IP00
Insulation class: B (130ºC)
Cycle duration: 2 minutes
Standard stroke "s": 8mm
Temperature rise: "DV31": 70ºC
Work: pull/push
Return spring incorporated: YES
Duty-cycle ED(%) |
100 |
40 |
25 |
15 |
5 |
Abs. Power at 20ºC (W) |
8 |
20 |
30 |
50 |
120 |
Minimum force (N) |
2.9 |
5.6 |
7.8 |
11.4 |
19.7 |
Max time under voltage(s) |
∞ |
48 |
30 |
18 |
6 |
Plunger weight (g) |
25 |
Solenoid weight (g) |
140 |
Duty-cycle ED(%) |
Standard voltages |
Under demand voltages |
VDC |
VAC |
VDC |
VAC |
6 |
12 |
24 |
48 |
100 |
125 |
205 |
110 |
230 |
Min |
Max |
Min |
Max |
100% |
O |
O |
O |
O |
O |
O |
X |
O |
O |
3 |
200 |
24 |
230 |
40% |
O |
O |
O |
O |
O |
O |
O |
O |
O |
5 |
230 |
50 |
230 |
25% |
O |
O |
O |
O |
O |
O |
O |
O |
O |
6 |
230 |
75 |
230 |
15% |
O |
O |
O |
O |
O |
O |
O |
X |
O |
6 |
230 |
125 |
230 |
5% |
X |
O |
O |
O |
O |
O |
O |
X |
X |
9 |
230 |
X |
X |
Layout: O= Available; X= Unavailable
Force stroke curve and Solenoid under voltage:
* On request, it can be supplied in any other dimension.
Remarks:
- Voltage under demand: They can be manufactured at any voltage between the maximum and minimum voltage values shown in the chart.
- To feed in alterning current the solenoid will have a rectifier incorporated in the coil.
- The duty cycles described in the chart are standard, they can be manufactured in any intermediate cycle.
- If any variation from the original is needed, please ask us.
- The terminals can be changed by leads.
- Earthing is recommended if the metallic parts are accessible..
Ordering code: ER30/C --V ED---% - Mounting position - Spring
Example:
- Standard voltage:24Vdc Duty cycle: ED100%: Mounting position A: With spring : ER30/C 24Vdc ED100% A RS
- Standard voltage:12Vdc Duty cycle: ED15%: Mounting position C: Without spring : ER30/C 12Vdc ED15% C RN
Recent Comments